Service activity

1. The main partners with which RESUMA Sp. z o.o. signed long term contracts for rendering services in the scope of repairs, overhauls and maintenance of machines and equipment, power and process installations are as follows:

In 2003 year ABB Elta Sp. z o.o. has been transformed on ABB Sp. z o.o.


2. Main partners for which Resuma Sp. z o.o. rendered services on the basis of quotations:

as well as all the companies listed in item 1.



winding press 200T after modernization

coil wire insulator - control box after modernization

special device for load lifting 250T


table for assembly of core transformers

table for assembly of core transformers

device for assembly of insulation units



plastic shredder machine PS80 type

control box plastic shredder PS80 type


List of main service orders
realized by Resuma Sp. z o.o.:

Order
Duration of the works
Principal
Manufacturing of mixers for bulk materials, adhesives and mortars
II and III quater 1994
Production Plant of Adhesives and Mortars "Atlas" s.c. in Lodz"
Design and manufacture of process equipment and internal transport for a new rotogravure printing machine
III and IV quater 1994 I quater 1995
Printing House Rentsch-Poland in Lodz
Disassembly and transport from Brilon (Germany) and manufacture of the installation, assembly and start-up of equipment for production of resin type transformers
III and IV quater 1995
ABB Elta Sp. z o.o. Distribution Transformers in Lodz
Participation in the reconstruction of galvanizing lines realized by "Matizon" company from Germany
III quater 1995
ABB Elta Sp. z o.o. Galvanizing Plant in Lodz
Participation in the reconstruction of a part of insulation elements production room - desing and realization of electrical, compressed air, central heating and exhaust system
IV quater 1995 and I quater 1996
ABB Elta Sp. z o.o. Insulating Elements Works in Lodz
Disassembly in Mannhem (Germany), transport, erection and start-up of machines and equipment for the production of insulating elements
IV quater 1995 and I quater 1996
ABB Elta Sp. z o.o. Insulating Elements Works in Lodz
Disassembly in Bad Honef (Germany), transport, erection and start-up of machines and equipment for the production of insulating elements
II quater 1996
ABB Elta Sp. z o.o. Insulating Elements Works in Lodz
Overhaul of coil wire insulators and modernization of drive and control system - installation of an inverter type variable speed drive
IV quater 1996 and I quater 1997
Power Equipment Repair Works ZREW S.A. in Lodz
Design and realization of power supply system as well as erection and setting up of a new transformer production line
II and III quater 1997
ABB Elta Sp. z o.o. Distribution Transformers in Lodz
Erection of a lacquering line produced by Ideal-Line
III i IV quater 1997
ABB Elta Sp. z o.o. Distribution Transformers in Lodz
Restructuring of a welding plant with the disassembly of the equipment of an old lacquering plant
I quater 1998
ABB Elta Sp. z o.o. Distribution Transformers in Lodz
Modernization of effluent treatment plant within a program of implementation of ISO 14001 Certificate
II quater 1998
ABB Elta Sp. z o.o. Galvanizing Plant Z-6 in Lodz
Disassembly in Geneva (Switzerland), transport, erection on prepared foundations and start-up of a transformer sheet metal cutting unit
III quater 1998
ABB Elta Sp. z o.o. Distribution Transformers in Lodz
Construction of an effluent treatment plant basing on the technology and equipment produced by "Surim" in Lodz for Ideal-Line lacquering line in the Welding Plant ABB Elta Sp. z o.o. in Lodz
III and IV quater 1998
ABB Elta Sp. z o.o. Welding Plant in Lodz
Reconstruction of a building for a lacquering line as well as the erection and start-up of the equipment produced by Ideal-Line
IV quater 1998
Measuring Instruments Works "Pafal" S.A. in Swidnica
Design and realization of 3 tables for the assembly of transformer cores of SMRT type
1999 – 2001 three pieces.
ABB Elta Sp. z o.o. Distribution Transformers in Lodz
Design and realization of equipment for the assembly of insulation units UMZI type
2000
ABB Elta Sp. z o.o. Insulating Elements Works in Lodz
Overhaul and modernization of 200T winding press
2000/2001
ABB Elta Sp. z o.o. Power Transformer Works in Lodz
Restructuring of Press Division with repairs of devices
2001
EMA-ELESTER Lodz
Restructuring of Machining Division
I quater 2002
FOS POLMO S.A.
Modernization of drives for 6 pieces horizontally winding machines
2002 - 2003
ABB Elta Sp. z o.o. Power Transformer Works in Lodz
Maintenance of line for spider assembly in VISTEON Praszka Poland
II quater 2003 - all time
ATS Automation France
Design and realization supply for devices on new area production
II and III quater 2004
ABB Elta Sp. z o.o. Insulating Elements Works in Lodz
Design and realiztion 2 tables for assembly of cores transformers TACT type
III and IV quater 2004
ABB AS Steinkjer Norway
Modernization of 37kW drive in vertical winding machine
III quater 2004
ABB Elta Sp. z o.o. Power Transformer Works in Lodz
Mantage and adjustment of measurement machine  PMM-120106 LEITZ
IV quater 2004
FOS POLMO S.A.
Design and realization table for the assembly of transformer cores of TACT type
II quater 2005
ABB Waterford Ireland
Design and realization table for the assembly of transformer cores of TAYT type
I quater 2006
ABB ELEKTRIK SAN AS Turkey
Montage in ABB Lodz 2 pieces horizontally winding machines BOB type supply with ABB Italy
IV quater 2006 and I quater 2007
ABB Elta Sp. z o.o. Power Transformer Works in Lodz
Design and realization plastic shredder PS80 type
I quater 2007
HANAOKA S.C. Lodz
Modernization of control system crane 1,5T
II quater 2007
YUN CHENG (POLAND) Sp. z o.o. Lodz